Whether it comes from a building inspector, a strata building report, an engineer or a certifier, a defect report can be long and technical. Here is how to work through one calmly and get the work done properly.
1. Look for anything urgent first
Most reports rank their items. Deal first with anything about safety: loose or falling concrete or render, unsafe balustrades, structural cracking, or water near electrical fittings. Keep people clear of those areas and have them made safe before anything else.
2. Understand what each item is asking for
Items in a report usually fall into a few groups:
- Items that need an engineer’s design or specification before they can be repaired
- Items that name a specific repair method or standard
- Items that need more investigation, because the cause is not yet known
- Maintenance items that can be planned for later
If the wording of an item is unclear, ask the person who wrote the report. It is better to settle what is required before anyone prices it.

3. Get the work priced against the report
Give your builder the full report, not a summary. Ask for a written scope that follows the report item by item, so you can see that nothing has been missed or added. Check what the price includes: access such as scaffolding, making good, finishes, any testing, and the records you will get at the end.
4. Check who needs to sign off
Some items need the engineer or certifier to inspect the work before it is covered up, or to confirm it at the end. Agree this before work starts, so the right people are booked at the right time and nothing has to be opened up again.
5. Keep good records
Photos before, during and after the work, the materials used, test results and sign-offs are worth keeping. They help with insurers, future buyers, the owners corporation and future maintenance.
If you are in a strata building
The owners corporation usually needs to approve the works and the budget, and residents need notice before work starts. Allow time for both when you plan the program.
Got a report that needs actioning? Send it through and we will get back to you.

