Remedial works for commercial buildings

Keeping your building safe, compliant and operating while the work is done.

A new black-framed window set into a rendered wall beside scaffolding.
A concrete pump boom reaching over a building site behind Davina Remedial site hoarding, with a worker on the formwork deck.
Two painters in white overalls working on a rendered building from scaffold.

Built for owners and managers

Commercial property owners need more than a good repair. You need clear scopes, reliable timeframes, careful communication and records you can put in front of an auditor or insurer. That is how we run every project.

What we do

Wet concrete pouring from a pump hose into timber formwork.

How we protect tenants, staff and trading businesses

Low disruption, planned properly

A Davina Remedial tradesman on scaffold planks finishing a rendered soffit.
  • Staged works planned around access, noise-sensitive times and trading hours
  • Tenant notices before work starts, and updates as it progresses
  • Site protection including dust control, safe walkways and secure work areas
  • A named project manager who answers your questions
  • Clean-down of work areas at the end of each working day

What you receive

Documentation you can rely on

A hand marking a measurement beside a tape measure on a steel plate.
  • A written scope of works and itemised price
  • A program with stages and expected durations
  • Progress updates, with photographs
  • Records of completed works and materials used
  • Warranty details for the work
  • Handover documentation
A worker drilling into a timber base plate with a cordless hammer drill.

Working with your consultants

We are happy to work to the specification of your engineer, building consultant or certifier, and to coordinate with your property manager and building manager. Not sure what is needed? We can help you work out the next step.

A timber staircase and curved wall wrapped in protective plastic during works.
A tiler cutting a porcelain tile with an angle grinder over a bucket.
Threaded rods set along steel plates, casting long shadows.

Featured project

The Darlinghurst automotive workshop floor, with vehicle hoists under the timber and steel roof framing.
A new red steel beam installed under the timber roof framing of a working automotive workshop, with a scissor lift alongside.
Close view of a blackened timber roof beam with a long split along its length.

Structural roof framing works at a live automotive workshop, Darlinghurst

Careful staging allowed the business to keep operating around the works.

  • Property Commercial workshop
  • Location Darlinghurst, Sydney
  • Service Structural and defect rectification
  • Duration 3 weeks

View the project

Tell us about your building and we will arrange an inspection.